Better Built Than the CBU, Cheaper to Run Than Petrol

1 0

I spent a week with the highest end, and now only, variant of the Leapmotor B10 CKD, the Design, and went in with two very specific questions rather than the usual general curiosity. The first was whether Malaysia’s freshly localised version of this car could actually match the CBU unit that launched the B10 story here, because local assembly has a reputation, not always deserved, for cutting corners the import didn’t. The second was a much bigger question that every single EV buyer in this country is quietly doing the math on right now, which is whether an EV genuinely saves you money against a tank of petrol once you strip away the marketing and just look at the numbers.

Both questions turned out to have clear answers, and neither is the answer you’d expect if you’d only read the usual spec sheet comparisons. The CKD build quality isn’t just acceptable, it’s genuinely excellent. And the running cost gap between a full tank and a full charge isn’t some rounding error you can hand wave away, it’s the kind of gap that changes how you think about owning a car in this country going forward.

The CKD Verdict: Panel Gaps Tighter Than I Expected

Let’s deal with the build quality question first, because it’s the one most people assume they already know the answer to. The received wisdom with CKD cars has always been that something gets lost in translation between the original import and the locally assembled version, whether that’s fit, finish, or just a general sense of solidity. The B10 CKD doesn’t just avoid that trap, it arguably does better than the CBU car that preceded it in this market. Panel gaps around the doors, bonnet, and boot are fitted perfectly, consistent all the way round the car rather than tightening up on one side and loosening on the other the way a rushed assembly line sometimes gives itself away.

There’s no rattling anywhere in the cabin either, which matters more than it sounds like on paper. Rattles are usually the first thing to show up when a car has been assembled in a hurry or with looser tolerances than the original design called for, and they’re exactly the kind of thing you notice on a rough stretch of highway or a pothole-scarred back road, not in a quiet showroom test drive. Over a full week of daily driving, through the kind of varied Malaysian roads that expose a loosely screwed together interior fast, this car stayed properly tight and solid. As far as I’m aware, no one in the Malaysian motoring press has actually put the CKD car through this specific comparison yet, mostly because CKD stock has only recently reached dealers in volume, which makes this a genuinely new data point rather than a rehash of what’s already out there.

Credit here goes to Stellantis’ Gurun plant in Kedah, which is handling the local assembly, and to Cycle & Carriage Bintang as the distributor bringing it to market. A CKD programme living up to, or beating, the import it replaces isn’t a guaranteed outcome, and Malaysian car buyers have been burned by the opposite often enough to be rightly sceptical. This is one of the clearer wins I’ve seen in that department in a while.

On Paper: What You’re Actually Driving

The Design variant is now the only way to buy a B10 CKD, since the entry level Life trim has been dropped from the local lineup entirely, and it still carries the same RM118,800 price despite effectively becoming the base model by default. Underneath, it’s a 67.1 kWh LFP battery feeding a single rear motor putting out 218PS and 240Nm, enough for a 0-100 km/h sprint in 8.0 seconds, with 434km of WLTP rated range on a full charge. That’s a genuinely competitive set of numbers for a C-segment electric SUV at this price point, and it’s rear wheel drive too, which is still unusual enough in this segment to be worth pointing out on its own.

DC charging is rated up to 168kW, with Leapmotor claiming a 30 to 80 percent top up in around 19 to 20 minutes. That figure is accurate for the fast middle stretch of the charging curve, but it’s worth understanding why the full picture looks different once you’re filling the battery all the way to 100 percent, which is exactly what the cost comparison below runs into.

The Real Question: A Full Tank or a Fast Charge?

This is where it gets genuinely interesting, because the economics have shifted hard and fast in 2026. As of the week covering 21 October 2026, the Ministry of Finance’s own figures put subsidised Budi95 RON95 at RM1.99 a litre, while the unsubsidised market price for that same fuel sits at RM4.62 a litre, more than double. Budi95 subsidised pricing only applies up to a government set monthly quota per eligible vehicle, so plenty of ordinary drivers are already paying something closer to that unsubsidised RM4.62 figure for a meaningful share of their monthly fuel, and that gap has only been widening as the subsidy gets more tightly targeted.

Put a real number on that using the B10’s closest direct ICE comparable on paultan’s own matching tool, Honda’s HR-V, which carries a 40 litre fuel tank and sits in almost exactly the same price band as the B10 CKD. A full tank at the unsubsidised RM4.62 a litre rate costs RM184.80. At the subsidised Budi95 rate, assuming you qualify and haven’t already burned through your monthly quota, it’s RM79.60. Either way, that’s the ceiling, and it’s a number you’re paying every single time that tank runs dry.

Now the EV side. I charged the B10 at a public DC fast charger from roughly 20 to 30 percent up toward a full battery, and it took over an hour, which sounds slow for a car rated at 168kW until you understand what’s actually happening on a charging curve. The fast, headline grabbing charge rate only holds for the middle stretch of the battery, typically somewhere between 20 and 80 percent. Above 80 percent, the car deliberately throttles the charge rate right down to protect the battery, which means the last 20 percent alone can eat up as much time as the entire 20 to 80 percent stretch before it. That’s not a flaw specific to this car, it’s how lithium battery charging physics works across virtually every EV on sale, but it does explain why going all the way to 100 percent at a fast charger takes noticeably longer than the headline number suggests.

Cost wise, though, this is where the EV wins outright. Gentari’s current DC rates, cut in July 2026, sit at RM1.30 per kWh at their 24kW chargers and RM1.40 per kWh at their 50kW, 60kW, and 120kW chargers, with roaming access through JomCharge and ChargEV as well. Charging the B10’s 67.1kWh battery from 20 percent to a full 100 percent draws roughly 53.7kWh, which works out to somewhere between RM69.80 and RM75.15 depending on which charger you land on. From 30 percent, it’s closer to 47kWh, or RM61 to RM66. That lines up almost exactly with what I actually paid at the charger, comfortably under RM80 and generally landing in the low to mid RM70s, against RM184.80 for a full tank of unsubsidised petrol in a comparably priced ICE rival. Even against the subsidised Budi95 rate, the fast charge still comes out ahead or roughly even, and that’s before you consider that subsidised pricing is the one variable in this entire comparison that’s being deliberately narrowed by policy, not widened.

The Smarter Way to Charge: Skip the Fast Charger Altogether

Here’s the part most people miss when they only compare fast charger receipts against petrol receipts. You don’t actually need the fast charger for daily driving at all. Plug the B10 into a home wallbox and the sums change again, dramatically. Using TNB’s standard domestic tariff of roughly 44 sen per kWh for typical household usage, a full 67.1kWh charge from empty costs around RM30, less than half of even the cheapest DC fast charging session, and a fraction of a tank of petrol at any price.

The trade off is time, obviously. A 7kW home wallbox takes around nine hours to fill the battery from empty, and a basic three pin plug stretches that out considerably further. But think about how that actually maps onto a real routine. You finish work, drive home, and plug in overnight, over a full eight to ten hours of sleep and downtime, which is exactly the kind of dead time a fast charger session can’t use but a home charger can. You don’t need to wake up to 100 percent either. Enough charge to comfortably cover a daily commute there and back, with margin to spare, is well within reach from even a partial overnight top up, and that’s before weekends, when the car can simply sit on the charger for as long as it needs to without anyone standing around waiting for it. It’s the single most compelling practical argument for EV ownership in this market, and it’s one that never shows up on a dealership spec sheet.

By the Numbers: CKD’s Bigger Policy Story

The B10’s sales numbers tell their own story about how disruptive this CKD transition has been. The car had racked up 977 cumulative units in Malaysia before an unexplained dip to just 43 units in September 2026, a drop that lines up suspiciously well with the exact window when CBU stock was running down and CKD stock was only just beginning to arrive at dealers. That kind of air pocket is a familiar pattern whenever a manufacturer switches assembly models mid cycle, and it’s a reasonable bet that October’s numbers, with Design variant CKD stock now flowing properly, will tell a very different story.

There’s a genuine policy angle sitting underneath all of this too. Malaysia’s duty free exemption for imported, CBU electric vehicles ended on 31 December 2025, replaced from 2026 with tiered import and excise duties that can run as high as 30 percent plus 30 percent plus a 10 percent sales tax, before any preferential ACFTA origin discount. CKD built EVs, by contrast, keep their full tax exemption all the way through to the end of 2027, and Putrajaya tightened the CBU rules again from 1 July 2026, requiring a minimum RM200,000 CIF value and at least 180kW of motor power for any new CBU EV import. None of that is abstract policy trivia, it’s the entire reason the B10’s pricing has stayed stable at RM118,800 even as its CBU rivals face a rapidly less favourable tax environment, and it’s a big part of why getting the CKD build quality right mattered so much in the first place.

Leapmotor B10 CKD Specifications

SpecLeapmotor B10 CKD (Design)
Price (OTR, w/o insurance)RM118,800
Variant lineupDesign (sole CKD variant; Life variant discontinued)
Battery67.1 kWh LFP
Motor / DrivetrainSingle rear motor, RWD
Power / Torque218 PS (~160 kW) / 240 Nm
0-100 km/h8.0 seconds
Range434 km (WLTP)
AC charging11 kW onboard
DC chargingUp to 168 kW (claimed 30-80% in approx. 19-20 minutes)
V2L output1.7 kW
AssemblyCKD, Stellantis plant, Gurun, Kedah
DistributorCycle & Carriage Bintang

Verdict

The Leapmotor B10 CKD answers both questions I came in with, and answers them well. The local assembly isn’t just good enough, it’s arguably tighter and more solid than the CBU car it replaced, panel gaps included, and that’s a genuinely new data point for a car that’s only just reached CKD volume in Malaysian showrooms. On running costs, the maths are no longer close. A fast charge to top up the B10 lands comfortably under RM80 against RM184.80 for a full tank of unsubsidised petrol in a comparably priced ICE rival, and a home overnight charge undercuts even that fast charger bill by more than half again. You don’t need to chase 100 percent at a public charger either, just enough overnight at home to cover tomorrow’s commute, which is the kind of unglamorous, genuinely useful detail that makes EV ownership here feel less like a lifestyle statement and more like simple common sense. At RM118,800, built properly and running this much cheaper than the alternative, the B10 CKD is a considerably easier car to recommend than its sales chart alone suggests.

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *